PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pouring concrete at foundation walls at Elev. 7-Stair -4,5 Facing South  (800x600).jpg Stripping bearing plate boxes at Elev. -1,2,3 Facing East (800x600).jpg Unbolting the slip forms at Elev. -5,6 2nd Floor Facing South (800x600).jpg Pouring concrete at Elev. 7-Stair -4,5 Facing North-West (800x600).jpg Damaged anchor bolts at c.l C-2 (800x600).jpg
Previous page Damaged anchor bolts at c.l C-2 (800x600)
Damaged anchor bolts at c.l C-2 (800x600)